hotline

15895191047   

image.png


Contact us

盐城市创惠电热科技有限公司

张天:15895191047 

杜文华:13961983587

许中勇:13962067633 

邮箱:1249802206@qq.com

地址:江苏省盐城市盐都区顺丰物流园2号楼403室

网址:   www.chdrkj.com  


shandongHeater Fan Price

Your current location: Home >> Products >> shandongWarmer

shandongHeater Fan Price

  • Taxonomy:shandongWarmer

  • Click times:
  • Date of release:2019/06/17
  • Specifications:
  • Type:
  • inquiry
  • introduce


Small heater

(1) In order to make the temperature field uniform and maintain a certain cross-section speed, when choosing the heater, the number of air circulation in the workshop should be checked and calculated, generally not less than 1.5 times per hour.

(2) When arranging the heater, it is advisable to connect the jet of the heater with each other. The producer of the heater makes the heating space form a general air circulation.

(3) The heater should not be placed on the outside wall to blow vertically indoors.

(4) The installation elevation of the bottom of the heater shall meet the following requirements:

When the outlet wind speed is less than 5 m/s, take 2.5-3.5 m; when the outlet wind speed is more than 5 m/s, take 4-5.5 M.

(5) The range X of the heater can be estimated according to the following formula:

X = 11.3v0D

The range of X - heater, m;

V0 - outlet wind speed of heater, m/s;

D - Equivalent diameter of heater outlet, M.

(6) The temperature of air supply should not be lower than 35 degrees C and higher than 55 degrees C.

Large heater

When using large-scale heater for heating, because the exit speed and air volume are very large, it should be arranged along the length direction of the workshop, the distance between the outlet and the side wall should not be less than 4m, the airflow range should not be less than the length of the workshop heating area, there should be no structure or large equipment in the range area, and the height of the outlet from the ground should meet the following requirements:

When the lower chord of the factory building is less than 8 m, 3.5-6 m is suitable.

When the lower chord of the workshop is more than 8 m, 5-7 m should be taken.

Large heaters should not be placed near the door of the workshop. The height of the bottom of the suction outlet from the ground should not be greater than 1 m or less than 0.3 M.


The address of this article:http://enchdrkj.mycn86.cn/product/629.html

Key word:

Recently browse:

Related products:

Related news:

Corporate name

Zhang Tian:15895191047 

Du Wenhua:13961983587

Xu Zhongyong:13962067633 

mailbox:1249802206@qq.com

address:Shunfeng Logistics Park, Yandu District, Yancheng City, Jiangsu Province

Website:   www.chdrkj.com  

Bottom navigation

Home      About      Product

News      Case      Heating

Message      Contact

Focus on us

manager zhangAlibaba
  • Service
  • number
    15895191047
  • Message
  • Online Service
    Please leave a message for us
    Please input the message here, and we will contact you as soon as possible.
    name
    Contacts
    Telephone
    Telephone
    mailbox
    mailbox
    address
    address