hotline

15895191047   

image.png


Contact us

盐城市创惠电热科技有限公司

张天:15895191047 

杜文华:13961983587

许中勇:13962067633 

邮箱:1249802206@qq.com

地址:江苏省盐城市盐都区顺丰物流园2号楼403室

网址:   www.chdrkj.com  


beijingHow about heat conducting oil furnace

Your current location: Home >> Products >> beijingHeat conducting oil furnace

beijingHow about heat conducting oil furnace

  • Taxonomy:beijingHeat conducting oil furnace

  • Click times:
  • Date of release:2019/06/17
  • Specifications:
  • Type:
  • inquiry
  • introduce

Necessary Conditions of Heat Conducting Oil Furnace before Operation

1. To go through the registration formalities for the heat conducting oil stove and get the registration certificate for its use. After the installation of the new furnace, it shall pass the inspection and acceptance of the local boiler inspection institute. The employer shall fill in the "boiler registration card" and go through the registration formalities with the boiler safety supervision department of the local quality and technical supervision bureau, and obtain the registration certificate for the use of the new furnace. The unlicensed furnace shall not be put into operation.

2. Furnace supervisors shall be assessed by the quality and technical supervision department and hold the Operation Certificate of Heat Carrier Furnace Division. Furnace supervisors shall be trained in heat carrier furnace expertise in addition to meeting the requirements of industrial boiler division.

3. Users should have a sound management system and safety operating rules.

Preparations before ignition

1. Inspection and preparation of internal and external organic hot-load furnaces, including:

The residual water in the heat conducting oil furnace has been exhausted and dried out; the impurities in the furnace have been cleaned up; the inspection holes and manholes have been sealed, and the use of fillers meets the medium requirements of heat carrier furnace.

Inspection of safety accessories and protective devices

The needle valve or globe valve at the front end of pressure gauge elbow is fully open. Pressure gauge accuracy, range, dial diameter meet the requirements, no pressure when the pointer back to zero.

The valve of the drain pipe of the level gauge is closed, and the drain pipe has been correctly connected with the storage tank.

Thermometers and automatic recording instruments have been checked and qualified. Overtemperature and overpressure alarms and automatic interlocking protection devices have been put into operation. There is no abnormality in electrical control contacts.

Inspection of combustion ventilation equipment, no abnormality.


The address of this article:http://enchdrkj.mycn86.cn/product/642.html

Key word:

Recently browse:

Related products:

Related news:

Corporate name

Zhang Tian:15895191047 

Du Wenhua:13961983587

Xu Zhongyong:13962067633 

mailbox:1249802206@qq.com

address:Shunfeng Logistics Park, Yandu District, Yancheng City, Jiangsu Province

Website:   www.chdrkj.com  

Bottom navigation

Home      About      Product

News      Case      Heating

Message      Contact

Focus on us

manager zhangAlibaba
  • Service
  • number
    15895191047
  • Message
  • Online Service
    Please leave a message for us
    Please input the message here, and we will contact you as soon as possible.
    name
    Contacts
    Telephone
    Telephone
    mailbox
    mailbox
    address
    address